The project included the demolition of two existing 44-square-meter operating rooms, an abandoned endoscopy suite, pathology department and surgery locker room area. Demolition created space for three new 55.6-square-meter operating rooms, a 111-square-meter hybrid operating room equipped with medical imaging devices and booms, a pathology department and a new surgery locker room.